- S. Court of Military Appeals, Washington, D.C. Renovation of a 40,000 SF historic courthouse.
- San Diego Courthouse – GSA peer review.
- Thurgood Marshall Courthouse – New York city – GSA Peer review
- Jackson Courthouse, Jackson MS – GSA Peer review
- Montgomery County detention Center, Rockville, Retrofit of a new 130,000 SF Detention facility. Modular water cooled chiller plant and modular condensing boiler plant. Sensible energy recovery for inmate housing units. Smoke control systems.
- Lynchburg Courthouse, Lynchburg, New 30,000 SF Juvenile courthouse. LEED silver building. Modular chiller/Boiler plants and Total energy recovery wheel application. Achieved 32% energy savings over ASHRAE 90.1 2004.
- Crawford/Dunn Buildings, Berkley county, WV. Retrofit of retail mall and conversion to office space and court rooms. Outdoor 500-ton chiller plant using UG piping network with Variable Primary flow pumping system.
- Federal bureau of Prisons, McDowell County WV. 700,000 SF Federal Correctional facility, consisting of Twenty Two buildings for a full operation of a Federal correctional Facility and Federal prison camp. Various facilities were designed such as waste water treatment plant, food service/dining, inmate housing units, healthcare suites, Recreational facilities, maintenance services, fuel oil storage, central chiller and boiler plant with associated underground campus wide distribution networks.
- Federal bureau of Investigation, Quantico, VA. 30,000 SF training Facility using air-cooled chillers.
- Drug Enforcement Agency, Quantico, 70,000 SF training Facility using water-cooled chillers.
- New River Valley Regional Jail, New 150,000 SF Jail. Virginia.
- Justice Data Center, Rockville, Maryland. Evaluation of fire protection systems for 90,000 sq.ft. computer data center.